The job sheet per location, with drawing and parts list Signed on the tablet at handover Missing items and damage reported with a photo

Custom app for assembly orders in project furniture

Appfront builds apps for suppliers and fitters of contract furniture: per project and per location, the installation job sheet on the crew's tablet, with the floor plan, the parts list per room and the installation instructions; the delivery checked off against the delivery note on arrival; missing items and transport damage reported with a photo before installation begins; and the handover signed per room by the client. So the project manager in the office knows what is on site, what is missing and what has been signed off, without the crew handing in paperwork in the evening.

What is an installation job sheet app for contract furniture?

An installation job sheet for contract furniture is the work order for the crew on site: which project, which floor and room, which furniture goes there according to the floor plan, which parts list belongs to it and how it is to be installed. An app puts that job sheet on the crew's tablet, lets them check off the delivery on arrival against the delivery note, records missing items and damage with photos, logs hours and lets the client sign for handover per room. Everything goes straight to the project manager and to the ERP.

Without an app, the crew drives to the site with a folder of floor plans, delivery notes and a handover form. When unloading, a desktop turns out to be damaged, which is jotted down on the delivery note and not seen in the office until Friday. The client signs one form for the whole floor, and when there is a complaint about a cabinet in room 3.14, nobody remembers whether it was handed over and whether the missing item was delivered afterwards.

We build custom because the app has to fit your projects and your systems: what your project planning and ERP look like, how floor plans and parts lists come about at your company, whether you work with your own crews or subcontractors, how follow-up deliveries are processed and what the client wants to see at handover. A generic work order app knows a job, but not a floor plan, a room or a delivery note.

Job sheet per room

The installation job sheet per project, floor and room with the floor plan, parts list and instructions, on the crew's tablet, even without reception in a new-build property.

Receipt, missing items and damage

The delivery checked off on arrival against the delivery note, missing and damaged parts reported with a photo, and the follow-up delivery triggered straight from the report.

Handover and hours

Per room, the handover with the client's signature and the snags attached, the hours per crew and per project, and everything with the project manager the same day.

How we build your installation job sheet app for contract furniture

We start with your last major project: how many rooms, how many crews, how many snags, and how long it took before the final outstanding items were resolved.

1
Mapping projects and crews

How projects are planned, how floor plans and bills of materials come about, how crews and subcontractors are managed, how snags and follow-up deliveries currently work, and which ERP you use.

2
Project structure and bills of materials

Projects with floors and rooms, the floor plan and the bill of materials per room from your drawing package or ERP, and the delivery notes per delivery.

3
Work order, receipt and handover

The installation work order on the tablet, the goods-received check, the snag and damage report with photos, the hours, and the handover per room with signature.

4
Integrating and taking over management

The integration with project planning, ERP and follow-up deliveries, reporting per project and crew, and then maintenance and extension to subcontractors and service.

What an installation work order app for contract furniture actually does

The components below come up at almost every contract furniture supplier. Which ones you need depends on the size of your projects and on whether you work with your own crews.

Installation work order with floor plan

Per room, the floor plan with the position of each piece of furniture, the bill of materials and the installation instructions, available offline on the tablet.

Goods-received check

Check the delivery against the delivery note on arrival, per package or per item, with an immediate alert to the office if there is a discrepancy.

Snags and damage

Missing or damaged parts reported with a photo and article number, with the follow-up delivery as a next action in the ERP.

Handover per room

Client signature per room or floor, with outstanding items and photos, and the handover report as a PDF sent to both parties.

Hours per crew

Start, finish and travel time per crew and per project, with post-calculation against the budgeted installation hours.

Project overview

Per project, which rooms are ready, handed over or blocked by a snag, and where each crew is, for the project manager at the office.

Who we build an installation work order app for in contract furniture

The app is intended for companies where a single project consists of dozens to hundreds of rooms and where the handover is currently signed on a single form for the whole project.

Office fit-out suppliers

Large projects with many identical workstations and a tight schedule per floor. The work order per room and the handover with signature are the core.

School and healthcare fit-out specialists

Many different rooms with specific furniture and a client who wants to sign per classroom or room. The floor plan per room and the outstanding items matter most.

Subcontracted installation companies

Installation for multiple manufacturers, with accountability per client. The hours per project and the handover report are what you need.

Manufacturers with their own installation service

Production, delivery and installation under one roof. Linking snags to the follow-up delivery from the factory is the core.

Not sure about a large project yet?

Test your idea first: a working prototype in 1 day

With OneDayBuild, we make your idea tangible in a single day for €1,150, so you know whether further development is worth the investment. Decide to go ahead with the full build? Then we deduct the cost in full.

View OneDayBuild →

Technology and integrations

This page is about on-site installation. For the planning that precedes it, see our page on installation planning software, for the work order in general our page on a work order app, and for the company as a whole our page on interior fit-out software. You can read about our approach at custom software development.

For planning crews and subcontractors across projects and days, there is our software for installation planning of office furniture.

For the logistics before installation, from the order at the manufacturer to delivery on the floor, there is our software for project delivery in office fit-out.

Installation work orders on a tablet without signal Floor plan per room Bill of materials from ERP or drawing package Goods-received check against delivery note Snag and damage reporting with photos Signature per room Handover report as a PDF Hours and post-calculation per project Integration with project planning and ERP Follow-up delivery as a next action

Why Appfront for your fitting job sheet app for contract furniture?

A project is complete when every room is complete. That's what we build on: the job sheet per room, the shortage reported before installation, the signature where the furniture stands.

The shortage is known before the crew starts

Tick off at unloading, report with a photo, follow-up delivery under way immediately. No more digging it out of the delivery note at the office on Friday.

The signature belongs to the room

Handed over room by room, with snagging items and photos. If a complaint comes in, you know what was there and who signed.

The office sees the site

The project manager sees per floor what is done and where a crew is stuck, the same day, without job sheets being handed in at the end of the day.

Security and privacy in a fitting job sheet app for contract furniture

The app works with client project data and floor plans, with signatures and photos of locations, and with hours worked by employees and subcontractors. Access is set up per role and per project: the crew only sees today's job sheets, a subcontractor only their own projects, the project manager everything for their projects. Floor plans of secure locations, such as courts or laboratories, can be restricted after handover. Every report, signature and change is logged with name and time.

The app runs in a European data centre, with encrypted storage and daily backups. Integrations with your ERP and project planning use their own keys, which can be revoked per integration.

Frequently asked questions about a fitting job sheet app for contract furniture

Questions that suppliers and fitters of contract furniture ask before they get started.

It puts the fitting job sheet for each project and room, with floor plan, parts list and instructions, on the crew's tablet, lets them tick off the delivery against the delivery note, records shortages and damage with photos, logs hours and has the client sign off each room on handover. Everything goes to the project manager and the ERP the same day.

From your drawing package or ERP: the floor plan per room with the positions, and the parts list per room from the order. We decide which format you use in the first step; you redraw nothing.

Yes. The day's job sheets, floor plans and parts lists are loaded onto the tablet in advance. Ticking off, reports, photos and signatures are stored locally and sent as soon as there is signal, with the time of the moment itself.

The crew reports the missing or damaged part with a photo and article number, and the report becomes a follow-up delivery order in your ERP or a task for the project manager. The room is not marked as complete until the follow-up delivery has been fitted, so a project is never handed over with open shortages.

Yes. Handover can be set per room, per floor or per project, with snagging items and photos per room. The client receives the handover report as a PDF, and snagging items stay open until they have been dealt with and signed off.

Yes. Projects, orders and parts lists come from the ERP, crews and days from the planning, and the hours, handovers and follow-up deliveries go back. We connect to what you use; the app does not become a second project administration.

Check that first. A job sheet app records a job with hours and a signature, and that is enough if your installations are small and handed over per address. A custom app makes sense when a project consists of dozens of rooms, when the floor plan and parts list per room need to be on the tablet, when shortages need to be tied to the follow-up delivery, or when the client wants to sign per room.

Every room handed over with a signature, and every shortage reported before installation?

Tell us how big your projects are, how floor plans and parts lists come about at your company, and how a snag currently gets from the site to the follow-up delivery. We'll show you what the work order per room, the goods-in check and the handover look like.

Edit content