One valid revision per drawing Issue with proof of receipt A drawing list that is always correct

Custom drawing revision management software for architects

Appfront builds drawing revision management for architecture firms: every drawing with a number, a status and a valid revision, issue to the contractor, structural engineer and client with a confirmation of receipt, a drawing list that updates itself, and the change between two revisions made visible. So the contractor builds to revision D and nobody has to dig a drawing from last month out of their inbox.

What is drawing revision management software for architects?

Drawing revision management is about controlling which version of which drawing applies, for whom, and since when. A drawing gets a number and a status per phase, from preliminary design to construction-ready design, and every change becomes a revision with a description. Issue to the contractor, the structural engineer or the client is recorded: who received what, and when. The drawing list is then no longer a separate document, but a view of the register.

Without such a system, the drawing list lives in a spreadsheet that someone updates when they remember, revisions go out by email to a list of addresses, and the contractor builds to whichever version he opened last. When there is a dispute about a wrongly placed opening, the project architect searches through sent items for the email in which revision C was sent, and the structural engineer turns out to still be calculating with revision B.

We build custom software because the management has to fit how your firm draws and issues: the numbering and phasing you use, whether you draw from a BIM model, which partners review, and how the client gives approval. A generic document platform has no concept of a drawing number, a phase or an issue.

Register and revisions

Every drawing with a number, phase, status and a valid revision; every change a revision with a description, date and draughtsperson, and the previous revision readable but no longer valid.

Issue with receipt

An issue to partners with the list of drawings and revisions, a link to the files and a confirmation per recipient. The issue list is the proof of what was sent and when.

Comparison and comments

Two revisions side by side with the change highlighted, and comments from partners on the drawing itself, linked to the revision they relate to.

How we build your drawing revision management software for architects

We start with a project that has been completed: which drawings, how many revisions, where the issue went wrong and what dispute followed. The register follows from that.

1
Mapping the drawing process

Which numbering and phasing you use, how you draw, who issues, which partners receive and how approvals are currently recorded. We look at the projects with the most revisions.

2
Register and numbering

The drawing register per project, with your numbering, phases and statuses, and the revision at its core. Linked to the project in your project administration.

3
Issuing and partners

Issuing to partners with confirmation of receipt, comments on the drawing and comparison between revisions. Partners work in the browser, with no software to install.

4
Integrating and taking over management

The integration with the BIM model and file storage, client approval, and then maintenance and new project types.

What drawing revision management software for architects actually does

The components below come up at almost every architecture practice. Which ones you need depends on your projects and on how your partners work.

Drawing register

All drawings per project with number, title, scale, phase and status, in a list that updates itself with every revision and issue.

Revision management

Every change is a revision with a description, date and draughtsperson; one current revision per drawing and the history behind it.

Handing out

An issue to selected partners with the drawings and revisions, a confirmation of receipt per person and the issue list as proof.

Comparison between revisions

Two revisions overlaid with the change highlighted, so a partner sees what has changed without reading the whole drawing.

Comments and approval

Partners and the client add comments to the drawing and approve a revision, recorded with name and date.

BIM and file integration

Drawings from the BIM model or your CAD package as a revision in the register, and the files in your own storage with the correct naming.

Who we build drawing revision management software for architects for

The software is intended for practices where drawings pass through many hands and where the question of which version applies now costs time and sometimes money.

Architecture firms

Projects with hundreds of drawings and partners who read along and draw along. The register, the issuing and the comparison are the core.

Architectural drawing offices

Drawing work for multiple clients, with issuing to their contractors. The issue list as proof and approval per revision matter most.

Practices that work in BIM

Drawings as a derivative of the model, with revisions that follow from model changes. The integration with the model and the naming are what you need.

Developers with their own design team

Multiple projects with changing practices and contractors. The overview of current revisions per project is the core.

Not sure about a large project yet?

Test your idea first: a working prototype in 1 day

With OneDayBuild, we make your idea tangible in a single day for €1,150, so you know whether further development is worth the investment. Decide to go ahead with the full build? Then we deduct the cost in full.

View OneDayBuild →

Technology and integrations

This page is about the revisions and issuing of drawings. For the permit application in which those drawings are submitted, see our page on an application file for an environmental permit, for working from the model our page on BIM software, and for drawings with client approval in manufacturing our page on a digital file for customer drawings. You can read about our approach on building software.

For the construction site, with the current revision always on your phone, there is our app for drawing revisions on site.

Drawing register per project Numbering and phasing to your standard Revisions with description and history Issuing with confirmation of receipt Comparison between revisions Comments on the drawing Client approval per revision Integration with BIM model and CAD Files in your own storage Reporting per project and partner

Why Appfront for your drawing revision management software for architects?

Revision management comes down to one question: which version applies, and who has it. That is what we build on: one register, one current revision, one issue list.

One valid revision

Each drawing has one current revision, and it is in the register. Old revisions remain readable, but nobody builds on them without seeing that.

Issuing is proven

Who received which revision and when is recorded with a confirmation. In a dispute, the issue list is the answer, not the mailbox.

The change is visible

Two revisions overlaid with the change highlighted. The structural engineer can see at a glance whether their calculation still holds.

Security and privacy in drawing revision management software for architects

Drawings are the intellectual property of your practice and of the partners who co-draw. Access is set up per role and per project: the project architect manages, a partner sees only the drawings issued to them, and the client only the revisions submitted for approval. Every issue, download and change is logged with name and time.

The software runs in a European data centre, with encrypted storage and daily backups; the files themselves can stay in your own storage. Integrations with the BIM model, CAD and the project administration use their own keys, which can be revoked per integration.

Frequently asked questions about drawing revision management software for architects

Questions architecture practices ask before getting started.

It keeps a register per project of all drawings with number, phase, status and the current revision, records every change as a revision with a description, issues drawings to partners with an acknowledgement of receipt, shows the change between two revisions, and records comments and approvals from partners and the client against the revision they relate to.

Yes. The numbering, phases and statuses can be configured to your practice's standard, even if it differs per client. A drawing that moves to a different phase keeps its number and is given the new phase in the register.

Through an issue: they receive a message with the list of drawings and revisions and a link to a page in the browser where they can view and download the files. Receipt is recorded per person, and you can see who has opened or downloaded a drawing.

Yes. Two revisions of the same drawing are overlaid with the change highlighted, so a partner can see what has changed. The revision description and the comments that led to the change are shown alongside.

Drawings that come out of the model are placed in the register as a revision, using your naming convention, so that a model change results in a new revision of the drawings concerned. Which package you use determines whether this happens automatically or via an export; we work with what you already have.

Yes. The files can remain in your own storage, with the naming that follows from the register. The software manages the register, the revisions and the issuing, and points to the files; there is no need to move your archive.

Check that first. Such a platform works well if the contractor or the client prescribes it and everyone works in it. Custom software makes sense if you want to prove issuing yourself across projects and platforms, if your numbering and phasing must take precedence, if the client approves each revision, or if the register is currently kept in a spreadsheet alongside the platform.

Every partner on the current revision, with proof of issue?

Tell us which package you draw in, how many drawings an average project has, and how often in recent months someone worked from an outdated revision. We will show you what the register, the issuing and the comparison look like.

Edit content