Custom app development for recording recognised measures in your properties

Which recognised measures apply to a building depends on what is in that building. That question is rarely answered behind a desk. Someone walks through the boiler room, looks at a rating plate and estimates what is there. What they see there determines the whole file that follows.

Appfront
Live

Why the survey determines the file

The energy saving obligation has two possible outcomes per measure: implement it, or demonstrate that the measure is technically or practically not applicable in this situation. Both answers stand or fall with the question of what is present in the building, because the recognised measures are linked to installations and building components.

The Recognised Measures Lists consist of three parts: buildings, facilities and processes, each divided into categories. Which categories apply to a building follows from the survey. A wrongly recorded boiler or a missed category carries through into everything recorded afterwards.

In practice, the survey goes wrong on small things. The rating plate is behind a pipe, the make is legible but the year of manufacture is not, or the room is numbered differently on the drawing than on the door. Filling that in from memory at the end of the day turns an observation into a recollection.

On top of that, a measure is cheapest at a natural moment: during a replacement or a renovation that was coming anyway. Anyone who sees during the survey that an installation is nearing the end of its life knows straight away which moment is approaching. That is information that only emerges on site.

How we build this

The core is the space and the installation in it. Everything that is observed is tied to the place where it was observed, not to the day someone entered it.

1
The building as a route

The surveyor walks through spaces and installations in a fixed order, so nothing gets skipped because it was at the back.

2
Recording what is there

Type, make, year of manufacture and condition, with a photo of the rating plate alongside. The photo is the evidence behind the entry.

3
Linking measures to it

What has been surveyed determines which recognised measures apply to this building. That happens during the survey, not afterwards.

4
Pass it on to the file

The survey lands in the building register, where the status of each measure and its justification are kept.

What the app actually does

The on-site survey carries the whole. What else you need depends on the number of buildings and on whether you survey them yourself or hire an adviser.

Survey route per building

Spaces and installations in a fixed order, with a counter showing what is still open. Coming back costs more than working through in one go.

Photographing the rating plate

A photo of the plate is faster and more reliable than retyping, and remains the evidence behind the data entered.

Works without signal

Boiler rooms, basements and technical rooms rarely have coverage. The app works locally and synchronises as soon as there is a connection.

Measures during the survey

As soon as it is known what is there, the app shows which recognised measures apply. The surveyor can form a view on them on the spot.

Noting the replacement moment

If an installation is nearing the end of its life, the surveyor records that as an upcoming natural moment.

Multiple buildings in a row

Anyone who covers three sites in one day does not want to log in three times and hunt for the same fields three times.

Who we build for

Who carries out the survey differs per organisation. Four situations.

Facilities staff

They know the building best and see replacements coming, but rarely have time to do a survey twice.

Energy advisers

Anyone who surveys for several clients wants one way of working and a survey that the client can then maintain themselves.

Technical managers

They know what is really there, including whatever was added later and never made it onto the drawings.

Property owners with many sites

For them the survey is not a project but a round that gets a little further every year.

Not sure about a large project yet?

Test your idea first: a working prototype in 1 day

With OneDayBuild, we make your idea tangible in a single day for €1,150, so you know whether further development is worth the investment. Decide to go ahead with the full build? Then we deduct the cost in full.

View OneDayBuild →

Technology and integrations

The lists are updated and the payback period is extended, which adds measures. Categories, input fields and installation types should be configurable rather than hard-coded in the app.

React Native or native iOS and Android Offline storage with synchronisation Photo with timestamp and location QR or NFC codes on installations Configurable survey forms per building type Space and installation register Alerts for upcoming replacements Roles for surveyor, management and advisory Integration with your maintenance system History per building and per installation

Why Appfront

A survey from memory is an estimate

What is filled in at the end of the day misses exactly the details that matter later. We build the input for use on site.

The photo is the proof

A rating plate on screen settles any discussion about make, type and year of manufacture. Retyping does not.

You only see the natural moment on site

That a boiler is nearing the end of its life shows in its condition. We let the surveyor record that straight away.

We do not advise on your installation

Which measure is technically suitable is a question for your adviser. We make sure the survey is accurate, so that he can base his advice on it.

Security and privacy

An inspection captures data about your properties and installations, and sometimes about tenants' spaces. We set access by role and by site, give an external inspector only the properties they are scheduled for, and log who viewed what. Everything stored locally on the device is encrypted and can be wiped remotely if a phone goes missing.

For this subject, what matters is that the record reflects the moment itself. An observation that was adjusted weeks later is no longer an inspection. We record findings immutably with time, location and person, even when synchronisation happens later, and turn any correction into a visible correction alongside the original entry. How we handle security ourselves is set out in our information security policy.

Frequently asked questions about inspecting recognised measures

Because inspections take place in boiler rooms and basements, with a torch and no signal. Anything that can't be done in a few taps there gets filled in later, and then it's an estimate.

What is in the room: type, make, year of construction and condition, with a photo of the rating plate as evidence behind the entry. This determines which recognised measures apply to the property.

The app shows which measures come into consideration based on what was recorded. Whether a measure is technically suitable remains a judgement for your adviser.

In the property register, where the status and supporting evidence are tracked per measure. We describe that file on our page about EML software.

Yes, and it is a common situation. An external inspector gets only the properties they are scheduled for, and their observations end up in the same file.

Yes. A replacement that has been identified can go straight on to the system where the work is already planned. See our approach to building an app.

Are you sure what is in your boiler room?

Pick one site and ask for the inspection on which the measures file is based. If there are no photos with it, the file rests on what someone remembered. We build this as a standalone app and as part of a broader app development project.