Measure per property Implement or justify File for the eLoket

Custom software for the Recognised Measures List and the information obligation

The energy-saving obligation has only two possible outcomes per measure: you implement it, or you can justify why it is technically or practically not applicable in your case. The latter is not a loophole but a file. And that file must be accurate per property and per installation, not for the organisation in general.

Appfront
Live

What the energy-saving obligation requires of you

The Recognised Measures Lists (Erkende Maatregelenlijsten) consist of three parts: buildings, facilities and processes. Each list is divided into categories containing the recognised measures. These are measures with a payback period of five years or less; with the revision, that threshold rises to seven years, adding measures that currently fall outside it.

Anyone subject to the obligation must implement the applicable measures, unless it can be demonstrated that a specific measure is technically or practically not relevant to that situation. That word demonstrated does the work: the difference between compliance and non-compliance lies in what you can show.

There is also the duty to provide information. Companies report via the eLoket of the Netherlands Enterprise Agency (Rijksdienst voor Ondernemend Nederland) which measures they have taken. That is a single moment, but the justification behind it is not: it builds up during a replacement, a renovation or a maintenance visit.

The rules are being revised. The changes land in the Besluit activiteiten leefomgeving (Environment and Planning Activities Decree), the Besluit bouwwerken leefomgeving (Buildings Decree) and the Omgevingsregeling (Environment and Planning Regulation), and the lists themselves are being updated. For anyone with multiple sites, that means the same question again, over a larger set of measures.

How we build this

The core is the combination of building and measure. A measure belongs not to the organisation but to a location, and the justification for why it does not apply belongs there too.

1
Map buildings and installations

Record what is on each site: heating, lighting, cooling, insulation and process installations. The measures attach to these.

2
Apply the list

For each building, the system determines which recognised measures are relevant, based on what is present.

3
Implement or justify

For each measure, you record that it has been implemented, with evidence, or why it is technically or practically not applicable.

4
Prepare for reporting

What has been recorded forms the basis for the report via the eLoket (the national online reporting portal), instead of someone pulling it together just before the deadline.

What the software actually does

The link between building and measure holds everything together. What else you need depends on the number of sites and on whether you are an owner or a tenant.

Measures per building

Which recognised measures apply here, given what is in this building. Not one list for the whole organisation.

Status with evidence

Implemented, planned or not applicable, each with the justification and the documents that go with it.

Retaining the justification

Why a measure does not apply here is the answer that gets asked for during an inspection. It should be on record, not in someone's head.

Making use of natural moments

A replacement or renovation brings a measure back into view. The system flags it instead of letting it pass.

Handling revised lists

If the list is updated or the payback period is extended, more measures are added. We keep track of what is new for which building.

Preparing the report

An overview per site that matches what you report via the eLoket, with the justification underneath.

Who we build for

Who keeps track of this differs per organisation. Four situations.

Companies with multiple sites

For them it is not a single question but the same question multiplied by the number of buildings, with a different answer for each building.

Property owners and investors

They deal with tenants who manage installations, while the obligation attaches to the building. That separation needs to be visible.

Facilities managers

They see replacements coming and are best placed to include a measure at the natural moment.

Energy advisers

If you advise multiple clients, you want one way of working and a file that the client can maintain themselves after the advice.

Not sure about a large project yet?

Test your idea first: a working prototype in 1 day

With OneDayBuild, we make your idea tangible in a single day for €1,150, so you know whether further development is worth the investment. Decide to go ahead with the full build? Then we deduct the cost in full.

View OneDayBuild →

Technology and integrations

The lists are being updated, the payback period is being extended and rules are moving between decrees. Measures, categories and applicability rules should be configurable rather than hard-coded.

Configurable measure lists per version Building and installation register Document storage for the justification Alerts on replacement or renovation Roles for facilities, property and advisory History per building and per measure Integration with your maintenance system Export for reporting Multiple sites side by side Audit trail on every change

Why Appfront

Not applicable is also an answer

But only if it is justified. We build that justification as a full status rather than an empty tick box.

The measure belongs to the building

What is a given at one site is not possible at another. One list for the whole organisation gives the wrong picture.

The natural moment is the moment

A measure is cheapest during a replacement that was coming anyway. If you miss that moment, you wait years again.

We do not advise on your installation

Which measure is technically appropriate is a question for your adviser. We make sure the answers stay findable and substantiated.

Security and privacy

A file on buildings and installations contains data that says something about how you run your business and sometimes about your tenants. We set access per role and per branch, give an adviser only the buildings they work on, and log who views what. Integrations with your existing software run through secure integrations.

For this topic, what matters is reliability at the moment of record. Substantiation added after an inspection is no longer substantiation. We record statuses and documents immutably, with a timestamp and the person responsible, and turn a correction into a visible correction alongside the original entry. How we handle security ourselves is set out in our information security policy.

Frequently asked questions about the EML and the duty to report

Three lists: buildings, facilities and processes. Each list is divided into categories containing the recognised measures. Which ones apply to you depends on what is present in the property.

You carry out the measures that apply, unless you can demonstrate that a specific measure is technically or practically not relevant to your situation. That justification is the file that counts during an inspection.

The payback period goes from five to seven years, which adds measures. The changes land in the Besluit activiteiten leefomgeving, the Besluit bouwwerken leefomgeving and the Omgevingsregeling.

Through the eLoket of the Netherlands Enterprise Agency (RVO), you report which measures you have taken. Reporting is a single moment; the substantiation behind it builds up during replacements and renovations.

The obligation attaches to the property and the activity, while installations are sometimes managed by the tenant. That separation should be visible in the file, otherwise everyone points at each other.

No. Replacements and maintenance stay where they are. We build the layer that links measures to properties and flags when a trigger moment comes up, as a standalone application or as a web application alongside what you already use.

Can you show per property why a measure does not apply?

Pick one site and one measure you have not carried out, and look for the justification. If it is not on paper, then in an inspection you have an opinion rather than an answer. We build this as a standalone application and as part of a broader software development project.

Edit content