Service · Web development

Custom digital product passport (DPP) software development

A custom DPP platform that complies with the EU Ecodesign for Sustainable Products Regulation (ESPR) and sector regulations such as the EU Battery Regulation. With QR/NFC per product, supply chain data collection and integration with your PIM and ERP, ready for the phased DPP requirements per sector.

ESPR-readyEU 2023/1542QR & NFCPIM integrationSupply chain data

What is a digital product passport.

A Digital Product Passport (DPP) is a standardised digital record that brings together all relevant data about a single physical product: composition, origin, carbon footprint, repair instructions and end-of-life guidance. It is accessible via a QR code or NFC tag on the product itself. The aim: to support the circular economy and create transparency across the entire supply chain.

The DPP is part of the EU Ecodesign for Sustainable Products Regulation (ESPR) and of existing sector regulations such as the EU Battery Regulation 2023/1542. Each sector has its own timeline: batteries lead the way (from February 2027), textiles and electronics follow, then construction materials, chemicals, packaging and automotive. We build DPP platforms that bring your product data, supplier data and compliance requirements together in a single source that stays accurate well beyond the legal deadline.

DPP regulation per sector.

Batteries (EU 2023/1542) — mandatory from February 2027 for EV batteries, light means of transport (LMT) batteries and industrial batteries above 2 kWh. Data fields include chemical composition, carbon footprint per life-cycle stage, origin of critical raw materials, capacity, and repair and remanufacturing instructions. The due diligence requirements for the battery supply chain are set out in the main regulation.

Textiles and clothing — 2027-2028 under ESPR. Data fields include fibre composition, country of origin for the main production stages, presence of substances of concern (SVHC/REACH), recyclability and repair information. Because of extended producer responsibility (textile EPR), the DPP aligns with national recycling contributions.

Electronics — consumer and professional electronics follow in 2027-2030, depending on the product group. Fields include energy rating, spare part availability, disassembly instructions, software update policy and recycled material percentage.

Construction materials — under the Construction Products Regulation plus ESPR from 2027-2028. Fields include declarations of performance (DoP), environmental product declarations (EPD), hazardous substances, reusability and disassembly.

Chemicals and packaging — from 2028 under ESPR and the revised Packaging and Packaging Waste Regulation (PPWR). Fields include substance identity, hazard classes, recycled content, recyclability and connection to the European SCIP system for substances of very high concern.

Automotive and fleets — from 2028. Fields include vehicle and component identification, recycled content, end-of-life route and alignment with the existing ELV Directive on end-of-life vehicles.

Food and agriculture — partly covered by sector protocols and the EU Pact for Skills; there is no full ESPR obligation, but supply chain transparency requirements around origin, organic certification and footprint are growing. For clients who already collect data in this area, we often build a lightweight DPP variant that draws directly from their existing agri-food software data.

The delegated acts differ per product group and the exact deadlines sometimes shift. In the first conversation, we map out for your specific product catalogue which obligation applies when, and which data fields you already have available.

Three flavours of DPP software.

It depends on your sector, your product volume and how much product data you already capture in a structured way. In the first conversation we'll determine which option fits and which compliance deadlines apply.

Compact project · fixed sprint budget

DPP starter for a single product line

A focused platform for one product category, with a sector template (battery, textiles, electronics), QR generation and a public product page for each item. Includes import of your existing product data from Excel or a simple PIM export. Enough to meet the first deadline without having to overhaul your entire stack straight away.

Sector templateQR codesPublic pageExcel import
Mid-sized project · fixed sprint budget

DPP platform with PIM and ERP integration

A production-grade platform that pulls live data from your PIM and ERP. Akeneo, Pimcore or Sales Layer on the product data side, Microsoft Dynamics, SAP, Exact or AFAS on the ERP side. Multi-tenant for groups with several brands, with an audit trail per data field and role-based access for suppliers, inspectors and end customers.

Akeneo / PimcoreSAP / DynamicsMulti-tenantAudit trail
Larger project · fixed sprint budget

Enterprise DPP with supply chain data collection

For manufacturers with deep supply chains. Includes a supplier portal for uploading material, CO2 and certificate data, EPCIS-compatible traceability events, NFC tags for high-value products, and an integration with CSRD/ESG reporting software. Suited to sectors where data comes in from dozens of tier-2 and tier-3 suppliers.

Supplier portalEPCIS eventsNFC tagsCSRD integration

What you get at the end.

A working DPP platform that is ready for the statutory deadline in your sector, plus everything you need to manage and extend it yourself.

  • The DPP platform itselfProduction and staging environments, running in your cloud (GCP, AWS or Azure) or with us. Public product pages for each item, on a subdomain of your own brand.
  • Sector data modelA data model aligned with ESPR and the sector delegated acts: battery (EU 2023/1542), textiles, electronics, construction materials or your own mix. Extendable as the regulations change.
  • QR and NFC generationA unique identifier for each product (linked to GTIN, serial number or batch). Bulk export to your packaging or labelling process. NFC for high-value products where a QR code physically doesn't fit.
  • PIM, ERP and API integrationsTwo-way synchronisation with your existing systems. We work through smart API integrations in which product data comes from a single source of truth and is never retyped by hand.
  • Supplier portalA secure environment where your tier-1 and tier-2 suppliers upload data, certificates and declarations. With validation, reminders and a clear overview of which products are complete and which are not.
  • Audit trail and role managementAn immutable log of who changed which data field and when. Role-based access for inspectors, end customers, recyclers and internal teams. Attack surface reduced with SSO and MFA where appropriate.
  • Codebase plus documentationFull source code, architecture overview and runbook. No lock-in to a SaaS vendor — you can continue with another party or an in-house team if you wish.
  • Maintenance contract (optional)Monitoring, backups, security patches, and further development as ESPR delegated acts for your sector are added. Fixed monthly price, tiered response times.

What a DPP needs to contain.

The exact data fields are set per sector in a delegated act, but most DPP regimes share a common set: product identifier (GTIN, serial number or batch), manufacturer and other supply chain actors, material composition with percentages per substance, substances of concern based on REACH/SVHC, carbon footprint per life-cycle stage, energy rating where relevant, repair and maintenance information, end-of-life instructions (recycling and disassembly), certificates and attestations, and transport and storage data.

For high-value products or products with a longer expected lifespan, ownership history is added: who bought, resold or had the product repaired, and when. This is not mandatory, but it is a feature that many customers in the second-hand and remanufacturing chain find immediately valuable. A custom DPP platform takes both layers into account: mandatory fields to meet regulations, optional fields to create commercial value.

Not sure about a large project yet?

Test your idea first: a working prototype in 1 day

With OneDayBuild, we make your idea tangible in a single day for €1,150, so you know whether further development is worth the investment. Decide to go ahead with the full build? Then we deduct the cost in full.

View OneDayBuild →

When custom DPP software is the right choice.

Standard SaaS platforms exist for product footprint and sustainability: SAP Sustainability Footprint, IBM Envizi, Salesforce Net Zero Cloud, Watershed, Climatiq and Provenance. We don't replace them for enterprises already using them. We do build custom software in these situations:

PIM integration

Akeneo or Pimcore is your source

Your product data already lives in Akeneo, Pimcore or Sales Layer and you don't want to move away from it. A SaaS DPP forces you into double entry; custom software reads directly from your PIM and publishes back to a single passport page.

Sector-specific

Industry flows are different

For manufacturing, batteries or textiles, the data fields and validations are so specific that a generic SaaS tool constantly requires workarounds. Custom software covers your workflow without compromise.

Supply chain

You collect data from suppliers

Your tier-2 and tier-3 suppliers provide material data, certificates and CO2 figures. Standard SaaS has no good portal for this; we build the onboarding and reminder process that works in your supply chain.

Group structure

Multiple brands, one compliance

You have a parent company with multiple brands or business units, each with its own products and suppliers. A multi-tenant DPP platform offers central compliance plus brand-specific presentation.

Track-and-trace

You already build traceability

You have or are considering a track-and-trace system. The DPP is then a natural extension: the same identifiers, the same events, different consumer and inspector views.

Second-hand & recycling

Ownership history is valuable

For high-value products (bikes, machinery, furniture, clothing), a DPP with ownership history and a repair log creates direct value in the second-hand market and with recycling partners. A feature that standard SaaS rarely covers out of the box.

How a DPP project works.

1

Introduction and scoping

A conversation in which we understand which regulations your products fall under, which deadline applies and what product data you already have in a structured form. We map the gaps between your current PIM/ERP and what the delegated act for your sector requires.

2

Data model workshop

A workshop with your product management, quality and IT teams. We map which data fields come from which source system, which supplier data you need to collect and what the public product page looks like. At the end: a sector-specific data model and a first screen flow.

3

Building in sprints

A working build every sprint. First the core data model and the public QR page, then the PIM/ERP integrations, then the supplier portal and the admin tooling. You test along, and so do a few suppliers. A first tier is up and running after a few sprints.

4

Pilot with one product line

You start with one product or one product category. The QR codes go on the packaging, and a defined group of customers and inspectors scans them. We optimise based on real usage before you roll out to the entire catalogue.

5

Rollout and ongoing maintenance

Phased rollout to your full product catalogue and supplier base. Ongoing maintenance for security patches, performance and updates when ESPR delegated acts for other product groups come into force.

What shapes a DPP project.

We don't work with product prices or packages. The scale of the project depends on a few concrete factors, which we discuss openly in the first conversation and capture in a fixed sprint budget.

Sector and regulations

A DPP under the EU Battery Regulation (2023/1542) has a different data model from a DPP under ESPR for textiles or electronics. The more specific the delegated act, the more validations are needed.

Number of integrations

A platform that only reads from Akeneo is quicker to build than one that also synchronises bidirectionally with SAP, Exact and AFAS and feeds a supplier portal.

Product variation

A hundred SKUs with the same template are easier to support than fifty product lines that each have their own data model. Variation determines the admin tooling.

Supply chain depth

A tier-1 supplier portal for twenty suppliers is a different beast from a portal that pulls tier-3 data via tier-1. Onboarding tooling then becomes a module in its own right.

Frequently asked questions.

What clients want to know before we start: DPP deadlines, integrations and data quality.

What are the DPP deadlines per sector?
The EU Battery Regulation (2023/1542) leads the way, with a DPP requirement from February 2027 for EV batteries, LMT batteries and industrial batteries. Textiles and electronics follow in 2027-2028 under ESPR, construction materials in 2027-2028, chemicals and packaging from 2028, and automotive from 2028. The European Commission publishes delegated acts per product group, and the exact dates sometimes shift; we keep track of the current status for your sector.
How does the DPP-PIM integration work with Akeneo or Pimcore?
We read your product data bi-directionally via the official Akeneo/Pimcore REST APIs or (with Akeneo Enterprise) via Connect. Product attributes you already manage in your PIM stay there; DPP-specific fields (material percentages, SVHC substances, repair instructions) are stored in a logical place, sometimes as a new Akeneo attribute group, sometimes in the DPP platform itself with a reference back. The same pattern applies to Sales Layer.
Where does the data for the DPP come from?
From three sources: your own PIM/ERP for product data, your suppliers for material and certificate data, and your production/lab for CO2 and test results. A DPP project therefore starts with a data mapping: for each data field, we determine which source is leading, how often it is refreshed and what happens when data is missing. Many clients discover they already have more data than they thought, but scattered across Excel files and emails.
How do we onboard our suppliers into the DPP?
Through a secured supplier portal with a separate login per organisation. For each product it is clear which data is missing, which certificates are expiring and when a repeat measurement is needed. We build fixed validations (e.g. material percentages must add up to 100%), automatic reminders and escalation to your purchasing team. For suppliers who don't want to use a portal, we offer a structured email or Excel flow as a fallback.
Does this replace our SAP Sustainability Footprint or IBM Envizi?
No, and that is usually not the intention. Enterprise platforms such as SAP Sustainability Footprint, IBM Envizi, Salesforce Net Zero Cloud, Watershed and Climatiq handle scope 1/2/3 reporting at group level. A DPP does something different: it collects, per physical product, the data that a customer, inspector or recycler needs. We build the DPP platform and integrate it with your existing sustainability suite where needed, rather than competing with it.
What determines the cost of a DPP platform?
The sector and its delegated act, the number of integrations (PIM, ERP, supplier portal, CSRD tools), the product variation and the depth of your supply chain. A first platform for one product line with one PIM integration is a well-defined project; a multi-tenant enterprise DPP with tier-3 supplier data is a larger one. We work with fixed sprint budgets and give you a realistic scope range in the first conversation.
Do you work with the EPCIS standard?
Yes. For clients who already record GS1/EPCIS traceability events, we build on that: the DPP then becomes a view on the events in your EPCIS repository. For clients who don't use EPCIS yet, we only suggest it if it adds real value; for many sectors, a simpler custom identifier model is enough to comply with ESPR.

Talk to us about your DPP project.

A no-obligation introductory call of half an hour. We listen to your products, your sector and your deadline, and give you useful direction, even if the outcome is that a SaaS tool suits you better than custom software.

Edit content