Custom software for sewer management and the inspection register
Until 2020, an inspection report arrived with the classes already filled in. Not any more: the inspector records what they see, and assigning classes has become the asset manager's job. In many organisations that task was added without anything being set up for it.
What has shifted since 2020
Two standards that underpinned Dutch sewer inspection for decades no longer apply. NEN 3398, investigation and condition assessment of external sewer systems, and NEN 3399, the classification system for visual inspection, were withdrawn on 28 January 2020. What applies now is European: NEN-EN 13508-1 from 2012 for the general requirements and NEN-EN 13508-2 for the coding, in the Netherlands the edition with the national part from March 2021.
More important than the numbers is what that transition did to the work. In its March 2019 classification methodology, Stichting RIONED writes that applying the classification is decoupled from January 2020: inspectors record in detail what they observe, and it is then up to asset managers to apply the classification to those results. That methodology is set out in tables with, for each line, the condition aspect code, three characterisations and a class on a scale of 1 to 5, separately for sewer pipes and for manholes.
What it did not include are the thresholds. RIONED provides an example set of warning and intervention thresholds, with a note that these are not formally established or standardised thresholds and that each asset manager decides for themselves which limit values to use. On the administrative side, the fixed trigger disappeared at the same time: article 4.22 of the Environmental Management Act (Wet milieubeheer), which made the sewerage plan mandatory, lapsed on 1 January 2024, and under the Environment and Planning Act (Omgevingswet) the sewerage programme is among the non-mandatory programmes. The duties under article 2.16 remain: rainwater, groundwater and urban wastewater.
If contaminated soil is involved in the work, you operate under an accreditation with its own notifications and an evaluation report. See the page on software for projects under BRL SIKB 7000.
How we build this
The unit is the object, not the inspection round. Everything ever observed, classified and decided about a pipe section or a manhole is attached to it.
Every object has its own identity, material, dimensions and year of construction. As long as the asset base exists only as a map layer, there is nothing to attach history to.
Files come in exactly as the inspector recorded them and land on the object. That turns the work of three contractors into a single series.
The class is assigned here and not in the field. If your methodology changes, you reclassify the whole series instead of only going forward.
At which class you monitor, warn or intervene is for you to decide. Those thresholds belong explicitly in the system and not in the head of one asset manager.
What the software actually does
The register per object carries the whole. What else you need depends on the size of your asset base.
Inspection register per object
Every observation, with its date, inspector and coding, is recorded against the sewer line or manhole it belongs to. The history carries over into the next round instead of starting again.
Classification against your own table
From condition aspect and characterisations to a class, according to your own table. Because the table is kept separate, you can revise it without touching the observations.
Warning and intervention against your own limits
The criteria are not standardised, so you define them yourself. That makes an assessment repeatable rather than personal.
Measures linked to the asset
Repair, renovation or replacement, with an owner and a status. The measure stays attached to the asset, even if it slips to a later budget round.
Multi-year planning that moves with you
Deferred work does not disappear but shifts visibly, along with the assessment behind it.
Importing from and exchanging with what you already have
Inspection files, your asset management package and your mapping system connect via integrations, so the network is managed in one place.
Who we build for
Who manages the network determines where the emphasis lies. Four situations.
Municipalities and water authorities
A large network, changing contractors and a budget set annually. The gain lies in the justification: why this sewer line now and that one later. The work in the ground itself belongs under civil engineering and infrastructure software.
Inspection and cleaning companies
You supply the observations and are judged on how usable they are. The fieldwork is covered on the sewer app page; this is about what you deliver and can find again later.
Engineering and consultancy firms
You assess on behalf of clients who each apply their own limit values. A separate table per client saves you from working out each time how their classes came about. See also audit software.
Sites with their own system
Business parks, campuses and housing stock with sewers beyond the property boundary. No urban water department, but the same question of when something needs to be done. If it concerns water treatment, see water technology.
Test your idea first: a working prototype in 1 day
With OneDayBuild, we make your idea tangible in a single day for €1,150, so you know whether further development is worth the investment. Decide to go ahead with the full build? Then we deduct the cost in full.
View OneDayBuild →Technology and integrations
The classification methodology has been revised and will be revised again. Everything to do with coding, classes and limit values should be configurable.
For exchanging sewer data according to the standard, there is our page on GWSW integration.
For cleaning road gullies, with routes for the suction tanker and registration per gully, there is our app for gully cleaning and route planning.
Why Appfront
Observation and class stay separate
We store the observation exactly as it was recorded and the class as a derived value. If you revise your methodology, you reclassify the whole series.
Your criteria belong in the system
Because the limit values are not standardised, you define them yourself. We make them explicit, so an assessment stays traceable when the manager changes.
Deferral stays visible
In many files, work that is pushed back drops out of sight. We keep it in place with the assessment behind it, because that is what the next round needs.
We don't set your ambition
Which condition you find acceptable is a policy decision for your board. We build the dataset that lets you substantiate that choice and sustain it.
Security and privacy
A sewer dataset maps what lies beneath the street and where it is in poor condition, including critical assets such as pumping stations and overflows. We set up access per role and per area, give a contractor only their own assignment and period, and log every view.
The second point is how well the assessment holds up over time. A class that can be quietly changed after the fact makes the multi-year plan indefensible as soon as someone asks a question about it. We record observations, assigned classes and the criteria used, each with a timestamp, source and person, and we make a reclassification a visible event with a reason attached. How we handle security ourselves is set out in our information security policy; external reports go through our coordinated vulnerability disclosure policy.
Frequently asked questions about sewer management
Those two were withdrawn on 28 January 2020. What applies now is NEN-EN 13508-1 for the general requirements and NEN-EN 13508-2 for the coding, in the Netherlands the edition with the 2021 national annex. The classification methodology itself has since been published by Stichting RIONED. We build on that coding and keep the tables configurable.
Because since January 2020 that step has been separated from the inspection. RIONED puts it like this: inspectors record in detail what they observe, and it is then up to asset managers to apply the classification. That keeps an observation usable if your methodology changes, but you do need software that does the job.
Nobody prescribes those. RIONED provides an example set and states explicitly that these are not formally established or standardised criteria, and that each asset manager decides for themselves which threshold values to use. We build the place where you record that choice; you make the choice itself with your adviser.
Article 4.22 of the Environmental Management Act (Wet milieubeheer), which made the municipal sewerage plan mandatory, lapsed on 1 January 2024. Under the Environment and Planning Act (Omgevingswet), the sewerage programme is among the non-mandatory programmes: the municipal executive may adopt such a programme. The duties under Article 2.16 remain. What you record is a choice made by your council; discuss it with your legal advisers.
That covers projects in civil engineering, roadworks and hydraulic engineering: specifications, cost estimating, execution and post-calculation. See civil engineering and infrastructure software. This page is about the asset management file alongside it: the assets, their condition and the planning that follows from it. The two meet as soon as a measure becomes a project.
Yes, and that is usually the first win. As long as the observations are delivered in accordance with NEN-EN 13508-2, they land on the same object and in the same series. We expose differences in coding rather than silently translating them, because that is where series become incomparable.
Yes, as an object with its own maintenance and fault history. Note, though, that the NEN-EN 13508-2 coding applies to gravity-fed outdoor sewer systems, so for a pumping station there is no classification table to fall back on. The round of the pumping stations is handled in the sewer app; for a broader maintenance rhythm, see maintenance software.
That depends on the size of your asset base, whether files and an existing asset management package need to be imported, and what your classification table looks like. The object register with the inspection history is usually usable quickly; integrations cost more. We give a well-founded estimate after the discovery phase.
Want to know whether your register can support an investment?
Pick one sewer section whose replacement you have postponed and check whether the class, the observation beneath it and the criterion you applied are all there. That is the question that comes back as soon as the budget is discussed. We build this as a standalone application and as part of a broader custom software project.