Lockout-tagout Energy sources per machine Lockout recorded

Building LOTO software

When maintenance is carried out on a machine or installation, all energy sources must be switched off and locked out, so that nobody can accidentally switch it back on. Lockout-tagout, or LOTO, records those steps: which energy, which valves, and who has a lock on it. Appfront builds software that keeps track of LOTO procedures per machine and registers every lockout.

What is LOTO software?

LOTO software supports the lockout-tagout procedure: the safety procedure that ensures machines and installations are properly shut down and cannot restart before maintenance or repair is finished. European rules require energy sources to be fully isolated and blocked during maintenance and repair work. For machinery, the NEN-EN-ISO 14118 standard describes how unexpected start-up is prevented, and for work on electrical installations, isolation under NEN 3140 applies.

A LOTO procedure starts with preparation: which forms of energy are present (electrical, mechanical, pneumatic or hydraulic), what hazards come with them, and where the isolation points are. Everyone involved is then informed, the installation is switched off and depressurised, and each engineer hangs their own personal lock on the isolation point. Only after a check that the installation is truly energy-free does the work begin. Afterwards, everyone removes their own lock and the installation is released.

On paper this often works well, as long as the procedure is small. With large installations that have dozens of isolation points, shift work and external engineers, it becomes hard to keep track of which locks are where and who is still working. We build software that records the LOTO procedure per machine, registers every lockout along with the people involved, and only allows release once all the locks are removed. The physical locks and tags stay; the software makes visible what is in place.

Here are a few examples of what such software does in practice. An engineer scans the QR code on a packaging machine and sees the procedure: three isolation points, electrical, pneumatic and a spring under tension, each with a photo and the sequence. They register their lock at each point and record that the machine can no longer start. A colleague on the next shift takes over the work; they hang their own lock alongside before the first engineer removes theirs, so the installation is never unprotected, not even for a moment. Afterwards, the shift supervisor sees that all locks are removed and releases the machine. If an isolation point is added, for example after a conversion, an authorised employee updates the procedure, and the previous version is kept.

Procedure per machine

Energy and isolation points.

Every lockout

Who, where and when.

Safe release

Only once all locks are removed.

How we build your LOTO software

We start with your installations and your current way of working: which machines, which energy sources and isolation points, who is allowed to lock out, how locks and tags are issued, and how work permits and maintenance orders currently run. Then we record the procedures and build the registration. We usually start with one department or production line, and the others follow.

1
Installations mapped

Energy, isolation points, roles.

2
Recording procedures

Per machine, with photos.

3
First department

Tested on the shop floor.

4
Rollout and maintenance

All lines and changes.

What LOTO software actually does

The components below appear in almost every LOTO solution. Which ones you need depends on the size of your installations and how you organise maintenance.

Procedures

Per machine and installation.

Isolation points

With photo and sequence.

Locks and tags

Issue and return.

Group lockout

Several engineers at once.

Zero-energy check

Recorded before the start.

Release

Only when everything is removed.

Who we build LOTO software for

LOTO software is intended for companies where maintenance on machines and installations happens daily, and where several people work on the same installation at once. Think of a factory with shift work and its own technical department, a food manufacturer that cleans its lines every day, or a maintenance company that works at clients' sites under their procedures. This is where having an overview of who has locked out matters most.

Production and manufacturing

Lines, presses and robots.

Process industry

Pipes, valves and pressure.

Food

Cleaning and changeovers.

Maintenance companies

Working under client procedures.

Not sure about a large project yet?

Test your idea first: a working prototype in 1 day

With OneDayBuild, we make your idea tangible in a single day for €1,150, so you know whether further development is worth the investment. Decide to go ahead with the full build? Then we deduct the cost in full.

View OneDayBuild →

Technology and integrations

If you also want to track maintenance and faults in your own software, read building maintenance software. For inspections of electrical installations there is our NEN 3140 inspection app, and for tool inspections inspection registration for electrical tools.

LOTO procedures Isolation points QR codes on locks Mobile app Work permits Maintenance management Personnel records Roles and permissions Reporting Log

Why Appfront for your LOTO software?

LOTO is about people with their hands inside a machine. A forgotten lock, an isolation point that was not on the list, or a release while someone is still working can have serious consequences. That is what we build on: the procedure for each machine clearly recorded, every lockout visible, and a release that is only possible when it is safe.

Visible

Which locks are where.

Full

Every isolation point on the list.

Verifiable

Every step recorded.

Security and privacy in LOTO software

LOTO software contains the names of employees and external engineers, their authorisations and when they worked on which installation. We only record what is needed for safety and accountability. We agree with you in advance who may see and change what. The GDPR applies.

The software runs in a European data centre or in your own environment, with encrypted connections and storage. A procedure can only be changed by authorised people, with a recorded reason, and the previous version is retained. This way, in the event of an incident or an audit, you can see which procedure applied at the time.

Frequently asked questions about LOTO software

Questions companies ask before building LOTO software.

No. The personal locks, hasps and tags stay. The software records which procedure applies, who placed which lock on which isolation point, and when it was removed again.

Yes. With a group lockout, everyone can see who is still working, and a release is only possible once all personal locks have been removed.

Yes. Engineers use an app on a phone or tablet, for example by scanning a QR code on the machine or the lock. Where there is no signal, the app can work offline.

Yes. A maintenance order or work permit can start the LOTO procedure, and the lockout is linked back to the order.

That depends on your installations. For machinery, NEN-EN-ISO 14118 on the prevention of unexpected start-up is an important standard, and for electrical installations NEN 3140. What applies to you is something you determine together with your safety officer.

Yes. External engineers get their own account with limited permissions, and their lockouts are recorded just like those of your own people.

Digitising your LOTO procedures?

Tell us how you lock out today and where you lack an overview. We'll show you how software makes every procedure and every lockout visible.

Edit content