EN 1090-1 and 1090-2 EXC1 to EXC4 Annual audit

EN 1090 certification for steel structures

If you place load-bearing steel structures on the market, you need a working Factory Production Control system and must have it assessed every year by a notified body. Appfront builds the software that fills that FPC file straight from production itself: which weld, by which welder, to which procedure, on which material, with which inspection.

What EN 1090 and the FPC file require of you

EN 1090-1 governs the conformity assessment of load-bearing steel and aluminium structural components and is the basis for the CE marking and the declaration of performance you supply. EN 1090-2 sets out the technical execution requirements. Central to both is the execution class, EXC1 to EXC4, which follows from the structure and its risk. The higher the class, the stricter the requirements for welding, inspection and record-keeping.

The system with which you demonstrate that you produce to those requirements is called Factory Production Control. It includes welding coordination under EN ISO 14731, welding quality requirements under the EN ISO 3834 series, qualified welding procedures with the associated WPS and WPQR, and welder qualifications under EN ISO 9606-1. A notified body assesses that system, and then again every year.

In practice, the craftsmanship is in order and the paperwork lags behind. A welder gains their qualification, but its validity has to be confirmed periodically. A WPS belongs to a material combination and a thickness, but on the shop floor people grab the nearest one. Material certificates sit in a folder and, when asked, can't be linked to a specific part. Fixing all that the day before the audit is exactly what this software prevents.

We build this as a separate layer alongside what is already running. At steel fabricators that is often estimating and erection planning software, sometimes an engineering document management system that holds drawings and revisions. If your production control runs through an MES, we pull part numbers and orders from there instead of having them entered again.

How we build your FPC file

We start on the shop floor. A file maintained in the office inevitably lags behind what has been welded; a file that originates on the shop floor is accurate.

1
Defining execution classes and scope

Together with your welding coordinator, we establish which execution classes you produce in and which requirements follow from them. EXC2 and EXC3 differ considerably in what must be recorded and inspected; software that doesn't distinguish between them asks for too much or too little.

2
Breaking down the file

We go through your current FPC manual and determine, for each element, where the data comes from: welder qualifications, WPS and WPQR, material certificates, inspections, non-conformities and calibrations. What stays manual, we state explicitly instead of pretending everything can be automated.

3
Building in sprints

We work in sprints and start at the weld position: which weld belongs to which part, which WPS applies and who is allowed to carry it out. Your welders and work preparation staff are involved, because the interface has to work with gloves on and in a noisy environment.

4
Mock audit and handover

Before handover, we run through the notified body's questions: show the complete file for this part. Anything that isn't complete at that point isn't finished. Then we hand over to your welding coordinator and work preparation team.

What the software actually does

Six components that together make up the FPC file. Which ones you need depends on your execution class and how much welding you do in-house.

Weld registration per component

Which weld, on which component, by which welder, to which WPS, and when. This makes it possible to reconstruct a component after the fact down to the individual weld seam, which is exactly what an auditor or a client asks for when a complaint comes in.

Welder qualifications with validity

For each welder, which qualifications they hold, for which range of materials, thicknesses and positions, and until when they are valid. The system only assigns welders to work that falls within their range, rather than flagging a problem after the fact.

WPS and WPQR linked to the work

The right welding procedure belongs to a specific material combination, thickness and position. We link the WPS to the component so the welder can see which one applies, instead of leafing through a folder and picking the nearest match.

Material certificates linked to the component

A batch arrives with a certificate, and that certificate must later be traceable to the component the steel ended up in. With a code on the material and a scan at issue, that traceability happens automatically.

Inspections and non-conformities

Visual inspection and non-destructive testing per weld, with the result and, in the event of a rejection, the repair and re-inspection. A non-conformity stays open until it is resolved, and the history remains visible in the file.

File per order and per component

Everything together at the place where the question is asked: show who welded this component, with which procedure, from which material and how it was inspected. On one screen instead of four binders.

Who we build for

Four types of producer. The difference lies mainly in the execution class and in whether welding is done in-house or outsourced.

Steel fabricators and structural workshops

The core of EN 1090. Alongside the FPC file, these companies usually already run software for estimating, drawing and installation planning; this layer sits alongside it and does not replace it.

Companies that also weld on site

On-site welding at the construction site is subject to the same requirements as in the workshop, but conditions are worse and registration falls behind more quickly. Being able to work offline is not a nice-to-have here but a requirement.

Producers of standard steel products

Columns, beams, fencing and load-bearing elements in series. The benefit here is that the file is built up per production run rather than compiled by hand for each piece.

Companies that outsource welding

You place the component on the market and bear the responsibility, but the welding is done elsewhere. The task then becomes requesting and monitoring someone else's file, which calls for a portal rather than a workshop app.

Not sure about a large project yet?

Test your idea first: a working prototype in 1 day

With OneDayBuild, we make your idea tangible in a single day for €1,150, so you know whether further development is worth the investment. Decide to go ahead with the full build? Then we deduct the cost in full.

View OneDayBuild →

Technology and integrations

What we use follows from your workshop and your existing systems. For registration on the shop floor, usability matters more than functionality: a screen that asks too much gets filled in from memory at the end of the day, and then the file is no longer accurate.

For assembly on the building site, there is our software for assembly work orders in steel construction.

If you also want to retain material provenance through sawing, cutting and offcuts, take a look at our batch traceability software for metal products.

Native iOS and Android Offline-first registration QR and DataMatrix labels Node.js / Python / .NET PostgreSQL Versioned document storage Integration with ERP and work preparation Import of material certificates Integration with drawing software PDF generation for the file Roles by function and qualification Audit logging of changes Export per order Hosting in the EU

Why Appfront

We start by walking the workshop floor

Before we design anything, we watch the welding and the work preparation. The difference between a file that is accurate and one that lags behind lies in actions that nobody mentions in a meeting room.

Preventing rather than flagging

Keeping a welder outside their qualification range is better than finding out afterwards. We build the check into the moment of assignment, not into a monthly report.

Connecting to your ERP and drawings

Part numbers, material lists and orders already exist somewhere. We pull them in through integrations instead of having them entered again, because double entry is where traceability breaks down.

Honest about what we don't do

We are not a notified body, we do not draw up welding procedures and we do not assess inspections. That remains the work of your welding coordinator and your certification body. We build the system underneath.

Security and privacy

An FPC file contains little personal data, but some of it needs care: which welder made which weld, and which qualifications they hold. That is traceable to an individual and touches on their professional competence. We use that link for what it is intended for, namely product traceability, and not as a basis for production figures per employee.

From a business point of view, something else weighs more heavily: your welding procedures and material choices are commercially sensitive, and the file contains all of them. We therefore keep access tight, with separate permissions for who may read and who may edit, and with a portal for external parties that only shows what belongs to their order. Changes to a completed record are logged and visible as changes; a file that can be quietly updated afterwards has no value in an audit. How we handle security ourselves is set out in our information security policy; reports from outside go through our CVD policy.

Frequently asked questions about EN 1090 and the FPC file

It is the system with which you demonstrate that what happens in your workshop continuously meets the requirements that come with your execution class. So it is not a document but a way of working: who is authorised, which procedures are used for welding, how material is checked and traced, how inspections are recorded and what happens in case of a deviation. A notified body assesses whether that system works, and then does so again every year.

They indicate how stringent the requirements are, rising with the risk of the structure. EXC1 covers simple structures with limited consequences in case of failure, EXC4 covers structures where failure has serious consequences. The difference lies partly in how much non-destructive testing is required and how extensively you record things. For software, this means the required registration differs per class; we make that configurable instead of imposing a single, strictest variant.

A qualification under EN ISO 9606-1 has a validity period that must be confirmed periodically, usually by the welding coordinator establishing that the welder has continued to work within their range. That is exactly where things go wrong in practice: the qualification has not lapsed because of a date, but because nobody recorded the confirmation. We build that confirmation in as a recurring task for the welding coordinator.

The page on steel construction software is about the business process: estimating, linking drawings, production and planning installation. This page is solely about the FPC file and the welding documentation that come with certification. In practice the two overlap, and in that case we build the file layer on top of your existing systems instead of a second system.

Partly. Certificates arrive as PDFs and sometimes in a structured format; with data extraction and a code on the material, you can largely automate the link to the batch. Some manual work remains: the initial registration on receipt. We tell you up front which part can be automated based on what your suppliers deliver, rather than promising full automation that falls apart with the first supplier.

Yes. Workshops have metal structures, machinery and sometimes basements, and the network drops out exactly where you need it. We build offline-first, with synchronisation as soon as there is a connection and clear visibility of which registrations are still pending. This applies even more to on-site installation.

Yes, but the form changes. You remain responsible for the component you place on the market, so you must be able to request and monitor your supplier's file. That means a portal where they submit their documentation, plus alerts for anything missing, rather than a workshop app. This is often a smaller project than if you weld in-house.

No. The manual describes how you work and remains the document the notified body assesses you against. The software carries out that manual and collects the evidence. If your way of working deviates from what the manual says, that is a reason to revise the manual; we then adapt the software to it, not the other way round.

Ready to build an FPC file?

Tell us which execution classes you produce in and what the last audit got stuck on, and we will help you think through the welding registration, material traceability and the integration with your work preparation. We build this as a standalone application and as part of a broader custom software project.