Zones, equipment and measures Category checked against zone Reviewed whenever the installation changes

Custom explosion safety and zoning software development

At most companies, the explosion protection document is a report from a consultancy. It was accurate on the day of delivery. Since then a pump has been replaced, an extraction system rerouted and a storage area moved, and nobody has picked up the document again. The question is not whether you have a document, but whether it still describes your installation.

Where the document and reality diverge

The obligation stems from Directive 1999/92/EC, commonly known as ATEX 153, which is implemented in the Netherlands through the Working Conditions Decree (Arbobesluit). The document must contain at least four things: an assessment of the risks, the classification into hazardous zones, the technical and organisational measures that follow from it, and the information provided to the people who work there. It is therefore not a report but a justification that ties the four parts together.

The zone classification is the linchpin. For gas or vapour there are zones 0, 1 and 2, and for dust zones 20, 21 and 22, ranging from almost always present to rare and short-lived. The classification determines which equipment is allowed: Directive 2014/34/EU, ATEX 114, defines equipment categories, where category 1 belongs to zones 0 and 20, category 2 to zones 1 and 21, and category 3 to zones 2 and 22. If a zone shifts, the requirement for everything inside it shifts too.

That is precisely where it goes wrong. The zone classification sits in a drawing held by a consultant, the equipment overview in a maintenance system, and the measures in a procedures manual. Three places that change independently of one another. If you want to know after a renovation whether the blower in that corner still has the right category, you have to lay three sources side by side and hope they are equally up to date.

If you work with substances on the list of substances of very high concern (ZZS), an additional duty to provide information applies, including a reduction plan. Since November 2024 all PFAS fall under it; see the app for ZZS and PFAS registration.

Alongside the explosion protection document, a ZZS information duty may apply to the same substances. We cover that on the page about software for the ZZS inventory.

How we build this

The link between zone and equipment is the heart of it. Everything else follows from it.

1
Recording the zone classification as data

Each zone gets its own record with its class, its boundary and the justification for why that class applies. A drawing is a representation, not a source.

2
Linking equipment to the zone

Each piece of equipment in a zone gets its category, marking and inspection status. The system checks these against the zone it is located in and flags it when the combination does not match.

3
Linking measures to risks

A measure without the risk it belongs to cannot be assessed. We record that relationship, so that when something changes it becomes visible which measures need to change with it.

4
Making a change update the document

A replacement, renovation or different product puts the zones concerned up for review. Without that step the document goes out of date unnoticed, and that is exactly what happens now.

What the software actually does

The register of zones with their equipment underpins everything. What else you need depends on how often your installation changes.

Zones with their justification

Each zone with its class, boundary and the reason why that class was assigned. In a discussion with the inspectorate, that justification is the conversation, not the drawing.

Category checked against the zone

The system knows the zone where a piece of equipment is located and the category it has. A category 3 item in a zone 1 shows up as an alert, rather than something someone has to spot.

Inspections with expiry dates

Explosion-proof equipment requires periodic inspection. Those deadlines pass without anything breaking, so without monitoring you only find out during an audit.

The document as a composition, not a file

The four mandatory parts are built from the current data. What you print is the situation as it stands now, not as it was the last time someone updated a text.

Changes that affect the document

A reported change to the installation puts the zones and equipment concerned up for review, specifying who has to assess it and by when.

Connection to the maintenance system

Equipment is often already recorded in a maintenance system. We retrieve that data through integrations, so that two separate lists do not arise.

Who we build for

Explosion risk isn't limited to the chemical industry. Four situations where it applies. Checks on the shop floor run through the ATEX app.

Process and chemical industry

Many zones, a lot of equipment and regular changes to the installation. The challenge isn't drawing up the document but keeping it up to date. See also software for the chemical industry.

Companies with dust explosion risk

Flour, sugar, milk powder, wood dust and metal dust create dust zones. These are overlooked more often than gas zones, because there is no tank or pipework involved.

Installers and maintenance contractors

You work at client sites with different zone classifications. Knowing which category is permitted where before you bring anything along saves you an aborted job.

Consultancies that draw up documents

At the moment you deliver a report that goes out of date from day two. An environment where the client keeps track of changes themselves turns your service from a one-off delivery into a subscription.

Not sure about a large project yet?

Test your idea first: a working prototype in 1 day

With OneDayBuild, we make your idea tangible in a single day for €1,150, so you know whether further development is worth the investment. Decide to go ahead with the full build? Then we deduct the cost in full.

View OneDayBuild →

Technology and integrations

Zone classifications and equipment categories are data, not code. Anything that the standard or the installation can change should be configurable and stored with its history.

If you are a consultancy preparing explosion safety documents for multiple clients, take a look at our software for the explosion protection document and zoning file.

Node.js / Python / .NET PostgreSQL Zone register with justification Equipment register with category and marking Checking category against zone Inspection and testing intervals Measures linked to risk Changes with a review workflow Compiled document with version history Integration with the maintenance system Roles and permissions Export for the inspectorate Audit logging Hosting in the EU

Why Appfront

The document is a compilation, not a file

We build the four mandatory components as linked data. A PDF is the output, not the source.

Checking zone against category belongs in the system

That is the check that currently depends on a person laying three lists side by side. We turn it into an alert.

A change must affect the document

Without that link, everything quietly goes out of date. We flag the zones concerned for review as soon as anything in the installation changes.

We don't build your zone classification

Determining zones is specialist work. We build the place where that outcome lives and keeps up with change.

Security and privacy

A zone classification with equipment data tells you exactly where your risk lies. That is information you don't want to share any more widely than necessary. We set access per role and per location, give an external adviser or installer only their own scope, and log every access.

For this subject, history carries a lot of weight. After an incident, the question isn't how things stand now but how they stood on the day itself, and that question comes from the inspectorate or an insurer. That is why we keep every change to a zone, a piece of equipment or a measure, with a timestamp and the person responsible, and show an amendment alongside the old value rather than overwriting it. How we handle security ourselves is set out in our information security policy; external reports go through our coordinated vulnerability disclosure policy.

Frequently asked questions about ATEX software

At least four components: the assessment of the explosion risks, the classification into hazardous zones, the technical and organisational measures that follow from it, and the information provided to employees. The obligation is laid down in the Dutch Working Conditions Decree (Arbobesluit) and derives from the European directive known as ATEX 153. You can check the exact requirements with the Dutch Labour Inspectorate.

ATEX 153 is aimed at you as an employer: the zones, the measures and the document. ATEX 114 is aimed at the manufacturer of equipment that may be used in such a zone. The two meet at the category: category 1 equipment may be used in the most hazardous zones, category 3 only in the least hazardous. That link is something a system can monitor.

No, and you shouldn't want to. Zoning is work for someone who knows your process, your substances and the standards. We build the place where that outcome is recorded, linked to equipment and reassessed when you renovate.

Yes. Dust explosion hazards fall under the same obligation, with their own set of zones: 20, 21 and 22. In practice, dust is more often underestimated because there is no visible tank or pipework. Flour, sugar, milk powder, wood dust and metal dust are well-known examples.

Usually, yes, and that is often the best route. The equipment is already in there with its location and maintenance history. We pull in that data and add what is missing: the zone where it is installed and the category that belongs there. Two separate lists always drift apart.

A reported change puts the affected zones and equipment up for review, with an owner and a deadline. This is deliberately a workflow and not just a notification, because the core of the problem is that a change currently triggers a reassessment nowhere.

Mainly because the question shifts from searching to showing. An inspector points at a spot and asks what is there, which zone it is and why. If that comes from a single record, it is a short conversation. If it comes from three sources of different ages, it becomes a long one.

That depends on the number of zones, the size of your equipment inventory and whether there is a maintenance system to connect to. The zone register with the category check is usually usable quickly and removes the biggest risk; integrations cost more. We give a well-founded estimate after the discovery phase.

Want to know whether your document is still accurate?

Take a piece of equipment that was replaced in the past year and find out which zone it is in and what category it has. How long that takes says enough. We build this as a standalone application and as part of a broader custom software project.

Edit content