Outstanding items per system with photo and priority Each party sees their own items Signed off and verified before handover

Custom snagging list software for commissioning

Appfront builds software for installation firms, contractors and machine builders who want to manage snagging lists at handover and commissioning. Each item is recorded against the system and location, with a photo, priority and the party responsible for resolving it. That party sees their own items, signs them off with evidence, and the client or your own team verifies them. This way, you can see at any time what is still holding up handover.

What is snagging list software for commissioning?

At the handover and commissioning of an installation, a building or a machine, there are always items left over: a finish that is not right, a sensor that does not yet work, a missing label, a test that needs repeating. These snags must be resolved by the party responsible and checked before the installation is handed over. Some items hold up commissioning, others can wait.

In practice, snagging lists sit in a spreadsheet that gets emailed round after each meeting. An item cannot be found without a photo or location. A subcontractor does not know which items are theirs, or receives a list of a hundred items of which five are relevant. What has been reported as resolved is never checked. And just before handover, nobody knows exactly what is still open.

We build custom software because projects differ: which installations, how many parties, how clients check work, and which systems you use for drawings and documents. The software fits how your projects are handed over, and works on a tablet in the building or at the machine.

Per system and location

Each item recorded against the system and location, with a photo, priority and category.

Each party their own items

Items assigned to whoever must resolve them, including subcontractors, with sign-off and evidence.

Verified before handover

What has been signed off is checked, and items that block handover are always visible.

How we build your snagging list software for commissioning

We start with your projects: which installations, how snags are currently recorded, who resolves them, and how the client checks. Clients often use their own way of grouping or prioritising. We adopt that, so everyone speaks the same language about what still needs doing.

1
Mapping your projects

Your installations, parties, handover method and systems.

2
Recording snags

Snags with photo, location, priority and category.

3
Signing off and verifying

Assignment, sign-off with evidence, and verification.

4
Handover and maintenance

An overview of what is holding up handover, followed by maintenance.

What snagging list software for commissioning concretely does

The components below come up in almost every handover. Which ones you need depends on your projects.

Snagging items

With photo, location and description.

Priority

Blocking or can be resolved later.

Allocation

To the responsible party.

Collection

With evidence of the resolution.

Verification

Checked by the client or team.

Overview

Per system and per party.

Who we build snagging list software for commissioning for

The software is intended for those who hand over or commission installations.

Installers

Many installation components per project. Assignment is the core.

Contractors

Many parties at handover. The overview matters most.

Machine builders

Commissioning at the client's site. Verification is what is needed.

Clients

Checks before handover. The blocking items are the core.

Not yet sure about a large project?

Test your idea first: a working prototype in 1 day

With OneDayBuild, we turn your idea into something tangible in one day for €1,150, so you can see whether further development is worth the investment. Decide to go ahead with the full build? Then we credit the full cost.

Explore OneDayBuild →

Technology and integrations

This page is about snagging items at handover and commissioning. For finishing trades, see our page on an handover checklist app for finishing work; for installers in general, our page on installer software; and for the inspection of electrical installations, our page on a NEN 3140 inspection app. You can read about our approach on software development.

Punch items per system Photo and location on drawing Priority and category Assignment to parties Sign-off with evidence Verification Blocking items Overview per party Working on a tablet Integration with the handover file

Why choose Appfront for your snagging list software for commissioning?

An outstanding item without a photo, an owner or a check will come back at handover. We build around that: outstanding items per system and location, each party sees its own items, and verification until handover.

Resolved faster

Each party sees its own items.

Properly checked

Signed off is not the same as done.

Handover in sight

What is still blocking sits at the top.

Security and privacy in snagging list software for commissioning

The software holds project data, drawings and photos of installations. Access is set up by role and by project, and a subcontractor sees only its own outstanding items.

The software runs in a European data centre, with encrypted storage and daily back-ups. Recording also works when there is no signal inside the building.

Frequently asked questions about snagging list software for commissioning

Questions that installers and contractors ask before they get started.

It records outstanding items per system and location with a photo, priority and category, assigns them to the responsible party, lets them be signed off with evidence, has them verified, and shows what is still holding up handover or commissioning.

Yes. A subcontractor gets access to its own outstanding items, signs them off with a photo or explanation, and sees what is still open. That means no list has to be circulated by email.

Sign-off is what the party that resolves the item does. Verification is the check by the client or your own team that it has really been resolved. An item is only closed after verification.

You define the categories, for example items that block commissioning and items that can be resolved after handover. The overview always shows the blocking items at the top.

Yes, if you have drawings of the project. An outstanding item can be pinned to the drawing so everyone can see where it is. That saves searching through a large building or an installation with many parts.

Yes, if it has an interface. Verified punch items and their evidence can be included in the handover file, so the client can see how everything was resolved.

Check this first. Some construction packages include a handover list, and that may be enough. Custom development makes sense if you work with many parties, if sign-off and verification are currently mixed up, or if you commission installations system by system.

Want to know what is still holding up handover?

Tell us which installations you are handing over, how many parties you work with and how outstanding items are currently tracked. We will show you what the snagging list looks like.

Edit content