Custom software for the high-voltage installation responsible person's file

Anyone who manages a high-voltage installation works under NEN 3840. The installation manager bears responsibility for the installation and for the work on it. They must be able to show who has been designated, for which installation and which work, under which work permit, and which switching operations have been carried out. Appfront builds software that maintains that file, so it is correct at the moment the work is done, and not only afterwards.

What is software for the high-voltage installation responsible person's file?

NEN 3840 covers the safe operation of and work on high-voltage installations: above 1,000 volts AC or 1,500 volts DC. Below that, NEN 3140 applies. Both standards were revised in 2025 and aligned with the updated EN 50110-1. Roles are central: the installation responsible person is accountable for the installation, the work responsible person for the work, and anyone working on the installation must be designated in writing.

The biggest difference from NEN 3140 is the work permit. For high voltage it is almost always mandatory: no work without a permit stating which part of the installation is isolated, which measures have been taken and who may carry out the work. This includes switching operations, earthing and release, in a fixed sequence. In many organisations, designations sit in a folder, permits are on paper, and switching operations are in a logbook that nobody checks against the permit.

We build custom software because organisations and installations differ: how many installations and substations, in-house staff or contractors, and how the work permit currently flows. The software follows your own procedures; the requirements that apply are set out in the standard and in your company regulations.

Designations at a glance

Per person and installation, with validity and an alert.

No work without a permit

Every work permit with measures and release.

Switching recorded

Switching operations alongside the work they belong to.

How we build your software for the high-voltage installation responsible person's file

We start with your installations and your procedures: which installations, who is designated, how the work permit currently flows, and where the overview is missing. We often begin with the register and the designations, because everything else builds on them. Work permits and switching operations follow once the register is in order.

1
Installations mapped

Register, roles and procedures.

2
Recording designations

Per person, installation and job.

3
Permits and switching

Work permit with measures and release.

4
Go-live and maintenance

Go-live, and updates when new requirements arrive.

What software for the high-voltage installation responsible person's file actually does

The components below appear in almost every installation responsible person's file. Which ones you need depends on your installations.

Register

Installations and substations.

Designations

Per person and installation.

Work permit

Per job, with measures.

Switching

Operations and release.

Validity

Alert on expiry.

Dossier

Audit-ready.

Who we build software for the high-voltage installation responsible person's file for

The software is designed for organisations that manage or work on high-voltage installations. The more installations and people, the more it delivers.

Network operators

Many substations. An overview of designations matters most.

Industry

Own high-voltage installation. The work permit is the core.

Energy parks

Work by third parties. Who may do what is what counts.

Installation companies

Working at client sites. Designations per client matter.

Not sure about a large project yet?

Test your idea first: a working prototype in 1 day

With OneDayBuild, we make your idea tangible in a single day for €1,150, so you know whether further development is worth the investment. Decide to go ahead with the full build? Then we deduct the cost in full.

View OneDayBuild →

Technology and integrations

This page is about high voltage under NEN 3840. For low voltage, see our page on the NEN 3140 inspection app with installation register, for installation overhauls our page on the electrical engineering overhaul file, and for inspections our page on the work equipment inspection log. You can read about our approach on building software.

NEN 3840 EN 50110-1 Installation register Designations Work permits Switching operations Earthing and release Training Company regulations Logbook

Why Appfront for your software for the high-voltage installation responsible person's file?

A designation that has expired without anyone noticing, and a work permit that is kept separate from the switching operations, are not an administrative problem in high-voltage work but a safety risk. That is what we build on: designations kept in view, no work without a permit, and switching operations recorded against the job.

Who may do what

Always up to date per installation.

Permit first

No work without one.

Audit-ready

The records are already there.

Security and privacy in software for the high-voltage installation responsible person's records

The software holds data on installations, employees and their designations, and on work on critical infrastructure. Access is set up per role, and every change, permit and release is recorded with the time and the name.

The software runs in a European data centre, with encrypted storage and daily backups. We document the processing in a data processing agreement.

Frequently asked questions about software for the high-voltage installation responsible person's records

Questions that high-voltage installation managers ask before getting started.

The installation responsible person carries responsibility for the installation and for the work carried out on it. They make sure that only designated persons work on it, that a work permit is in place, and that switching operations, earthing and release go smoothly.

NEN 3840 covers high voltage, above 1,000 volts AC or 1,500 volts DC; NEN 3140 covers low voltage. For high voltage, a work permit is almost always mandatory, whereas for low voltage it is often not. Both standards were revised in 2025.

Yes. For each person, it records which installations and which type of work they are designated for, by whom and until when. When a designation is about to expire, you get an alert in good time, so nobody starts work without a valid designation.

The work supervisor requests a permit for a job, stating the part of the installation, the measures and the people involved. The installation responsible person issues it, and switching operations, earthing and release are recorded against that permit.

Yes. Contractors' employees receive their own designation for your installations, with their training and validity shown alongside. That way you can see who may do what even when work is carried out by third parties.

Yes. Designations, permits and switching operations are brought together per installation and per period, showing who did what and when. You have nothing to reconstruct.

Check that first. Some maintenance systems include work permits. Custom software makes sense if designations, permits and switching operations are currently spread across different places, or if your procedures don't fit a standard package.

Want the installation responsible person's records in order?

Tell us which installations you manage, how designations and work permits currently work and who is involved. We'll show you what the software looks like.