Appfront builds construction flow planning for finishing contractors: per project, the homes or units in the order of the construction flow; per home, the phases of your work with the days they take; the crews that follow the flow from one home to the next; the dependency on the preceding trade, such as the plasterer or the installer; and any shift reported by the main contractor, immediately recalculated for your crews and your materials. So the site manager does not have to recalculate the week every Monday with the contractor's construction schedule and their own Excel sheet.

What is construction flow planning software for finishing contractors?

Construction flow planning means scheduling your work per home in the order in which the build moves through a project: home 1 gets the plasterer in week 38, home 2 in week 39, and your crew follows that flow. The software records the flow per project, your phases per home with the time they take, and the crews that work through the flow. If the main contractor shifts a block, the software calculates what that means for your crews, your other projects and the materials that need to be on site each week.

Without such a system, the site manager receives the contractor's construction schedule as a PDF and converts it into their own Excel sheet per project. If the contractor moves block C back by two weeks, they have to work out which crew was there, whether it can move to another project, and whether the materials ordered for block C are now in the way on site. With four projects running at once, that is a day's work every week.

We build custom software because the planning has to follow your trade: which phases your work has per home, which preceding trade must finish first, how you put crews together and calculate standard times, how main contractors submit their schedules, and which ERP you use. A generic planning board knows tasks and people, but not homes, flow, or a contractor who keeps shifting the schedule.

Flow per project

The homes in flow sequence, with your phases and standard times per home taken from the home type, and the trade that must finish before you.

Crews on the flow

Crews assigned to the flow rather than to individual tasks, across projects, with the capacity per week and a warning when two flows need the same crew.

Shifts calculated through

The main contractor's new schedule imported or entered, and the impact on crews, other projects and materials visible before you reply.

How we build your construction flow planning software for finishing contractors

We start with the most recent shift from a main contractor: what it cost you to deal with it, which crew stood idle because of it, and whether the materials were rescheduled in time.

1
Mapping projects and crews

Which types of projects you do, what your phases per home look like, how you determine crews and standard times, how contractors submit their schedules, and which ERP you use.

2
Home types, phases and standard times

The home types with your phases and standard times, the dependencies on preceding trades, the crews and how they are made up, and the projects with their flow.

3
Planning, shifting and recording

The planning board per project and per crew, processing shifts, materials per week, and hours recording per home from the building site.

4
Integrating and taking over management

The integration with the project administration and the ERP, the post-calculation per home against the standard time, and then maintenance.

What construction flow planning software for finishing contractors actually does

The components below appear at almost every finishing contractor in serial construction. Which ones you need depends on how many projects run at the same time and how your contractors plan.

Flow planning per project

Homes in flow sequence, with the phases, the dates and the preceding trade per home, on a timeline per project.

Home types and standard times

Per home type, the phases with the days and the crew size they require, so a new project of eighty homes is laid out in a few minutes.

Crew planning across projects

Crews on the flow, the weekly crew allocation across all projects, and a warning when a crew is double-booked or has a gap.

Shifts

The contractor's new schedule imported or entered per block, with the impact on crews, other projects and materials in view.

Materials per week

The flow determines which materials must be on which site and when, together with the order and call-off that go with them.

Hours per home

The crew records hours per home and phase from the building site, with the post-calculation against the standard time as a signal for estimating.

Who we build construction flow planning software for finishing contractors for

The software is intended for finishing contractors whose work runs in flows through housing projects, and where the main contractor's schedule can upend their own planning every week.

Plasterers and spray painters

Early in the finishing flow, dependent on the installer and decisive for who comes after you. Flow planning and shifts are the core.

Tilers and floor layers

Multiple phases per home with drying times in between and materials per home. Standard times per home type and materials per week matter most.

Painters and finishing contractors

Late in the flow, with handover as a fixed date. Crew planning across projects and post-calculation are what you need.

Finishing specialists with multiple disciplines

Walls, ceilings and finishing done one after another by your own crews. The dependencies between your own phases are the core.

Not sure about a large project yet?

Test your idea first: a working prototype in 1 day

With OneDayBuild, we make your idea tangible in a single day for €1,150, so you know whether further development is worth the investment. Decide to go ahead with the full build? Then we deduct the cost in full.

View OneDayBuild →

Technology and integrations

This page is about planning the building flow. For planning at a painting company, see our page on scaffolding planning software; for the planning board as a tool, our page on planning board software; and for the construction company as a whole, our page on construction company software. You can read about our approach on building custom software.

If you want to close out the finishing work per home with a checklist and photos, take a look at our handover checklist app for finishing work.

Flow planning per project Home types with standard times Dependencies on preceding trades Crew planning across projects Importing the contractor's schedule Shifts calculated through Materials and call-offs per week Hours per home from the build Post-calculation against standard time Integration with project administration and ERP

Why choose Appfront for building flow planning software for finishing contractors?

In serial construction, your planning is only as good as the main contractor's planning, and that changes. That is what we build on: the flow as the structure, the shift as a normal event.

The flow is the planning

Not individual tasks, but homes in sequence with the crews that follow them. Setting up a project means choosing the flow and the home type.

A shift is a calculation, not a day's work

The contractor moves a block; the software shows which crew, which other project and which materials it affects. You can respond the same day.

The standard time is tested

Hours per home against the standard time per home type. The calculation for the next project uses what it actually cost.

Security and privacy in building flow planning software for finishing contractors

The software works with the schedules of main contractors, your standard times and calculations, and the hours of employees and subcontractors. Access is set up per role: the crew sees its own schedule and logs hours, the site manager plans their projects, management sees capacity across everything and the post-calculation. Every shift is logged with its source and time, so in a discussion with a contractor it is clear which schedule applied when.

The software runs in a European data centre, with encrypted storage and daily backups. Integrations with the ERP and project administration use their own keys, which can be revoked per integration.

Frequently asked questions about building flow planning software for finishing contractors

Questions finishing companies ask before getting started.

It records the homes per project in flow order, your phases per home with standard times and the trade that precedes them, and plans crews on the flow across projects. A shift from the main contractor is calculated through to crews, other projects and materials, and the hours per home are logged and compared with the standard time.

If the contractor supplies a schedule file, it is imported and compared with the previous version, so you only see the shifts. If you receive a PDF or an email, the site manager enters the shift per block, and the software calculates the rest.

The software shows the gap alongside the other projects that week and suggests where the crew can be deployed. The site manager decides; the software calculates the consequences for both projects.

Yes. Per home type you record the phases with the days and crew size they take, and the hours the crew logs per home are measured against them. If a home type deviates structurally, you see it per project and adjust the standard time for the next calculation.

For each home type and phase, you define which materials are needed, and the flow shows what has to be on site per week and per build. If the flow shifts, the call-off shifts with it, and the software flags materials that have already been delivered for work that has been postponed.

Yes. Projects and cost calculations come from the project administration, and hours and materials go back for invoicing and post-calculation. We connect to what you already use; the planning does not become a second project administration.

Check that first. A planning board with crews and tasks is enough if you run one or two projects at a time and the contractor rarely reschedules. Custom software makes sense when several streams share the same crews, when schedule changes happen weekly, when materials are tied to the stream week by week, or when you want to check standard times per home type.

Every flow planned, and a contractor's change recalculated the same day?

Tell us how many projects run at the same time, how your contractors submit their planning and how you currently process a change. We'll show you what the flow planning, crew planning and recalculation look like.