Planning on the actual cycle time The right mould on the right machine Mould changes and drying planned in

Custom injection moulding planning app based on cycle time

Appfront builds apps for injection moulders who want to plan their machines on what actually happens: for each mould, the suitable machines based on clamping force and shot weight, the actual cycle time and number of working cavities taken from the machine, mould changes and material drying planned in, and a schedule that adjusts when an order runs slower than expected. So the planning matches the shop floor, and a delivery date is not missed because the cycle time in the ERP has been wrong for years.

What is an injection moulding planning app based on cycle time?

In an injection moulding shop, the cycle time determines how long an order occupies a machine. A mould with eight cavities and a twenty-second cycle produces a certain number of products per hour; if one cavity is blocked off or the cycle is longer, the planning no longer holds. An injection moulding planning app plans on the actual cycle time and the number of working cavities, and takes into account which mould fits on which machine.

In many injection moulding shops, the ERP holds a cycle time that was entered once and never updated. The planner knows that one mould runs slower than the system thinks, and corrects by feel. A mould change that takes longer, or material that still has to dry, isn't in the schedule. An order that falls behind is only noticed once it's late. And finding out which machine is free for a rush order means a walk around the shop floor.

We build custom software because the planning has to fit your machine park: which machines you have, with what clamping force and ancillary equipment, which moulds fit which machines, how long changeovers take, which materials need drying, which machine controllers supply data, and which ERP holds the orders. An ERP plans on standard times; it doesn't know the actual cycle or the cavity that's been blocked off.

Actual cycle time

Cycle time and active cavities taken from the machine, so the planning works with what actually happens and not with what was entered once.

Mould on the right machine

For each mould, the machines that fit on clamping force, shot weight and ancillary equipment, so the planner only chooses what's possible.

Changeovers planned in

Mould changes, material changes and drying times built into the schedule, so the time between two orders isn't forgotten.

How we build your cycle-time-based injection moulding planning app

We start with last week's schedule: how many orders ran differently from plan, why, and how much time went on changeovers.

1
Mapping machines and moulds

Your machines and ancillary equipment, moulds with cavities and suitable machines, changeover times, materials, and your ERP and controllers.

2
Master data and integration

Machines, moulds and materials recorded, orders from the ERP, and cycle times and cavities from the machines.

3
Planning

The schedule per machine with changeovers and drying times, and adjustment to actual progress.

4
Maintenance and integrations

Machine and mould maintenance in the schedule, integration with MES and ERP, and then ongoing support.

What a cycle-time-based injection moulding planning app actually does

The components below come back at almost every injection moulder. Which ones you need depends on your machine park and your orders.

Machines and moulds

Machines with clamping force and ancillary equipment, moulds with cavities and the machines they fit on.

Cycle time from the machine

Actual cycle time and active cavities from the machine controller, updated per order.

Planning board

Orders per machine on a timeline, draggable, showing only the machines that fit.

Changeovers and drying

Mould changes, colour and material changes and drying times built into the schedule.

Adjustment

The schedule shifts as an order runs faster or slower, with an alert when a late delivery looms.

Maintenance

Scheduled maintenance of machines and moulds, and moulds that need maintenance after a set number of shots.

Who we build a cycle-time-based injection moulding planning app for

The app is intended for injection moulders whose planning is currently based on standard times and gut feeling.

Technical injection moulders

Many moulds with small runs. Mould changeovers and the right machine are the core.

Packaging manufacturers

Long runs with high volumes. Actual cycle time and adjustment matter most.

Automotive suppliers

Call-offs with fixed delivery dates. The alert for a looming late delivery is what's needed.

Plastics processors with many colours

Colour and material changes determine the sequence. Changeovers and drying times are the core.

Not sure about a large project yet?

Test your idea first: a working prototype in 1 day

With OneDayBuild, we make your idea tangible in a single day for €1,150, so you know whether further development is worth the investment. Decide to go ahead with the full build? Then we deduct the cost in full.

View OneDayBuild →

Technology and integrations

This page is about scheduling injection moulding machines. For recording rejects, see our page on reject registration in injection moulding, for the plastics industry as a whole our page on plastics industry software, and for production planning in general our page on production planning software. You can read about our approach at custom software development.

If you run extrusion and the die determines your planning, take a look at our software for die planning in extrusion.

Machines with clamping force and features Moulds with cavities Suitable machines per mould Orders from the ERP Cycle time from the machine controller Active cavities Mould and material changes Drying times Adjustment based on progress Maintenance of machines and moulds

Why Appfront for your injection moulding scheduling app based on cycle time?

A schedule that doesn't match the shop floor gets ignored. That's what we build on: calculating with the actual cycle time, the right mould on the right machine, and a schedule that moves with reality.

A schedule that holds up

The cycle time comes from the machine. An order that takes longer is scheduled accordingly.

Spotted in time

An order that's falling behind triggers an alert while there is still time to reshuffle.

Less searching for rush jobs

Which machine is free and where the mould fits is shown on the planning board.

Security and privacy in an injection moulding scheduling app based on cycle time

The app contains orders, customers, and machine and mould data, all confidential company information. Access is set up per role: the planner plans, the shift leader sees their own machines, and sales sees the delivery dates. Changes to the schedule are logged with name and time.

The app runs on your own server or in a European data centre, with encrypted storage and daily backups. The integration with machine controllers is read-only.

Frequently asked questions about an injection moulding scheduling app based on cycle time

Questions injection moulders ask before they get started.

It records which moulds fit which machines, pulls the actual cycle time and active cavities from the machines, schedules orders per machine including mould changes, material changes and drying times, adjusts the schedule based on progress, and warns you of deliveries at risk of being late.

From the machine controller, via a standard interface that many modern injection moulding machines have. Where that isn't possible, from the operator's registration or a counter.

From the machine and mould data: clamping force, shot weight, dimensions, and features such as a hot runner or core pullers. You record per mould which machines it can run on.

Yes. Each change has a time, which can depend on the mould and the machine. Colour and material changes and drying times are also part of the schedule.

No. Orders stay in the ERP; the app builds the schedule per machine and returns the expected completion date.

Then the mould produces fewer parts per cycle. The app calculates with the number of active cavities and adjusts the schedule accordingly.

Check that first. Some ERP and MES systems schedule on machines, and that's enough if the standard times are accurate. Custom software makes sense if you want to schedule on the actual cycle time, if mould-machine combinations and changeovers are decisive, or if your current schedule isn't followed on the shop floor.

A schedule that matches what happens on the shop floor?

Tell us how many machines and moulds you have, how you plan now, and which machines supply data. We'll show you what the planning board, the cycle times and the adjustment look like.