Custom app for window frame schedules in the joinery industry
Appfront builds apps for joinery workshops and window frame manufacturers that create a window frame schedule for each building project: every frame mark from the specification and drawing with quantities, dimensions, profiles, swing direction, glazing, hardware, burglar resistance and colour, queries to the architect and contractor recorded against the mark, every change saved as a new version, and the contractor's approval before the schedule goes to production planning and production. So nothing is produced on a version that is already out of date.
What is a window frame schedule app for the joinery industry?
A building project has anywhere from dozens to hundreds of window frames, grouped into marks: frame A appears forty times, frame B twelve times in mirror image. The window frame schedule is the list of all those marks with everything the factory needs: dimensions, profiles, swing direction, glazing, hardware, burglar resistance, ventilation, interior and exterior colour. A window frame schedule app creates that list from the specification and drawing, manages the queries and changes, and makes sure only approved work goes into production.
Without an app like that, the schedule lives in a spreadsheet that the production planner builds from the specification and drawings. Queries to the architect go by email, the answers arrive in another email, and a change from the contractor is processed in version four while the factory has already started on version three. Which marks have changed between two versions has to be compared by eye. And the contractor's approval is an email sitting in a colleague's inbox.
We build custom because the schedule has to fit your factory: which products and profile systems you make, how you currently process specifications and drawings, whether you can read from a building model, which drawing package and which ERP production planning and production use, and how you communicate with contractors and architects. A drawing package draws the frame; it knows nothing about the list of a hundred marks, their queries and their versions.
Schedule per mark
Every frame mark with quantity, dimensions, profile, swing direction, glazing, hardware, burglar resistance, ventilation and colour, from the specification, drawing or building model.
Queries and versions
Queries to the architect or contractor recorded against the mark, answers processed into a new version, and for each version you can see which marks have changed.
Approval before production
The schedule goes to the contractor for approval, with approval recorded per version in the app. Only after approval does the schedule go to production planning and production.
How we build your window frame schedule app for the joinery industry
We start with a live project: how many marks, how many versions, how many queries, and how often something was made on a version that had already changed.
Your products and profile systems, how you currently process specifications and drawings, the production planning and production software, and communication with contractors.
Entering or importing frame marks with their characteristics, checking for missing or illogical data, and the schedule per project.
Questions and answers per mark, versions with differences, and approval by the contractor and architect in the app.
The handover to estimating, production planning and production, the overview per project, and then maintenance and extension.
What a window frame schedule app does in practice for the joinery industry
The components below appear at almost every joinery factory. Which ones you need depends on your products and on how specifications reach you.
Mark entry and import
Window frame marks entered or imported from a list or building model, with their quantities and the locations in the building where they occur.
Properties per mark
Sizes, profiles, opening direction, glass, hardware, burglar resistance, ventilation and colour per mark, with checks for combinations that are not possible.
Questionnaire
Questions per mark to the architect or contractor, with status and answer, so that open questions per project are all in one overview.
Versions and differences
Every change as a new version, showing for each version which marks have changed and what changed.
Approval
The schedule goes to the contractor and, where needed, the architect for approval, with sign-off per version and a block on production until approval is given.
Handover
The approved schedule goes to estimating, the drawing package, production planning and ERP, so nothing has to be retyped there.
Who we build a window frame schedule app for in the joinery industry
The app is intended for factories where the window frame schedule is currently built up in spreadsheets and emails.
Joinery manufacturers
Timber window frames, windows and doors for housing and commercial construction. The schedule per mark and sign-off before production are the core.
Manufacturers of PVC window frames
Many marks per project in fixed profile systems. Import and the checks per mark matter most.
Contractors with their own joinery workshop
Window frames for your own projects, with short lines of communication. The questions and versions are what you need.
Factories for renovation and transformation
Existing buildings with many non-standard sizes. The integration with measurement data and the versions are the core.
Test your idea first: a working prototype in 1 day
With OneDayBuild, we make your idea tangible in a single day for €1,150, so you know whether further development is worth the investment. Decide to go ahead with the full build? Then we deduct the cost in full.
View OneDayBuild →Technology and integrations
This page is about the window frame schedule per project. For the whole process from measuring to installation, see our page on window frame software; for the factory as a whole, our page on joinery factory software; and for measuring on site, our page on an app for measurement lists in joinery. You can read about our approach on building custom software.
Why Appfront for your window frame schedule app for the joinery industry?
A window frame made to an old version goes back to the factory. That is what we build around: one schedule per project, questions attached to the mark, and producing only what has been approved.
Producing to the right version
Production planning sees only the approved version. Any change afterwards is a new version with a new sign-off.
No more lost questions
Every question is attached to the mark it concerns. The overview of open questions per project is on a single screen.
Differences at a glance
For each version you can see which marks have changed. Nobody has to lay two spreadsheets side by side.
Security and privacy for a window frame schedule app in the joinery industry
The app contains project data, drawings and agreements with contractors and architects. Access is set up per role and per project: production planning edits the schedule, contractors and architects see their own projects and give approval, and production sees the approved version. Every change and every approval is logged with name and time.
The app runs in a European data centre, with encrypted storage and daily backups. Integrations with the drawing package and ERP use their own keys, which can be revoked.
Frequently asked questions about a joinery frame schedule app for the carpentry industry
Questions joinery manufacturers ask before they get started.
It builds up the schedule of window and door frame marks per project, with quantities, dimensions, profiles, hinge direction, glazing, hardware, burglar resistance, ventilation and colour, records questions per mark, tracks every change as a version with the differences, has the contractor approve it, and passes the approved schedule on to work preparation and production.
If the building model contains the frames as objects with their properties, the app can import them as a proposal for the schedule. Your work planner fills in whatever is missing. How useful a model is depends on how it was set up; we look at that per project.
In a dedicated environment per project, the contractor sees the schedule, the questions awaiting an answer and the differences between versions, and gives their approval. Without approval, the schedule does not go to production.
Yes, provided the drawing software can import data. The approved properties per mark are passed to the drawing software, so the draughtsperson doesn't re-enter what is already in the schedule.
The change becomes a new version with a new approval. The app shows which marks it affects and how much of that is already in production, so you can assess what the change will cost.
These requirements are recorded per mark from the specification, with checks on combinations of hardware, glazing and profile that don't meet what you have included in the schedule. The technical assessment stays with your work preparation team.
Check that first. Some software packages for the carpentry industry have a project schedule, and that is enough if you have few versions and questions. Custom development makes sense when schedules are large, when contractors and architects need to review and approve, or when versions are currently compared by eye.
Never produce from an outdated version again?
Tell us which frames you make, how specifications and drawings reach you, and how you currently coordinate with contractors. We'll show you what the schedule, the versions and the approval would look like.